PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilled and compacted inside Stair -4 pit Facing East (800x600).jpg Backfilling inside Stair -4 Facing North-East  (800x600).jpg Finished installing a manhole at Rahway Ave. Facing North-East (800x600).jpg Finished stripping all the bearing plate boxes and the platforms at Elev. 4-Stair -2 (4th Floor) Facing South.jpg Finished stripping the shear wall panels at Stair -4 (4th Floor) Facing South East (800x600).jpg
Next page Backfilled and compacted inside Stair -4 pit Facing East (800x600)
Backfilled and compacted inside Stair -4 pit Facing East (800x600)